Solega Co. Done For Your E-Commerce solutions.
  • Home
  • E-commerce
  • Start Ups
  • Project Management
  • Artificial Intelligence
  • Investment
  • More
    • Cryptocurrency
    • Finance
    • Real Estate
    • Travel
No Result
View All Result
  • Home
  • E-commerce
  • Start Ups
  • Project Management
  • Artificial Intelligence
  • Investment
  • More
    • Cryptocurrency
    • Finance
    • Real Estate
    • Travel
No Result
View All Result
No Result
View All Result
Home Project Management

Version Control in Project Management Software

Solega Team by Solega Team
September 18, 2024
in Project Management
Reading Time: 9 mins read
0
Version Control in Project Management Software
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter


Tasks are consistently altering. Whether or not you’re a developer, normal contractor, producer, skilled providers supplier or IT director, preserving monitor of these modifications is important to managing venture property. Model management in venture administration is the method that manages and tracks these modifications.

What’s model management in project management? We’ll reply that query and the way venture administration software program like ProjectManager makes use of model management to retailer and handle venture modifications. The advantages are clear, however we’ll listing them to point out the significance of model management in venture administration.

What Is Model Management in Mission Administration Software program?

Model management in venture administration is a device to trace modifications made to project management software. It does this by saving each model of the venture plan, permitting customers to revert to an older or unique model of the venture if needed.

Additionally known as supply management, it permits not solely the monitoring and saving of software program code but in addition permits customers to handle these variations. This provides venture managers and their groups the flexibility to work sooner and higher.

Each modification to the code or venture is saved within the software program database. Which means if there’s a mistake, the consumer can return and switch again the clock to view and, if wanted, revert to that model earlier than the error was made.

Easy methods to Use ProjectManager’s Model Management Options

ProjectManager has a model management characteristic that tracks each change made to a venture and permits venture managers to revert to an older model every time they need. That is particularly helpful with venture administration as there are at all times dangers that staff members will make a mistake. Now, in the event that they do, ProjectManager will revert that venture to a degree earlier than the problem.

To check out the model management characteristic, take a free 30-day trial of ProjectManager. You may import present initiatives from Excel, CSV and Microsoft Mission recordsdata or begin one from scratch. There are additionally many various templates to get began faster.

ProjectManager's Gantt chartProjectManager's Gantt chart
Use venture model management to revert to any time limit on the Gantt and different views. Learn more

As soon as a venture has been created, comply with these steps.

1. Get Entry to Model Management

The model management characteristic in ProjectManager is barely accessible to the creator or supervisor of the venture. The characteristic is enabled mechanically for each venture. If you have already got a ProjectManager account, needless to say model management is barely accessible on Enterprise and Enterprise editions.

2. Click on Mission Title

To make use of the characteristic, click on on the venture identify, which may be discovered on the highest left of any of the multiple project views.

Showing where version control is on ProjectManagerShowing where version control is on ProjectManager
3. Select Mission Variations

A popup window will present up on the display. Select venture variations. It will present a window with a bulleted listing of dates and occasions. These symbolize when the venture was altered in a roundabout way.

The window reveals each process creation and deletion, hyperlinks, schedules, assignments, priorities and extra. Relying on the subscription, customers will see the newest 90 days of modifications or all of the modifications made for the reason that venture’s initiation.

If there are various modifications made by the identical individual in fast succession they are going to be grouped, making it simpler to flick thru these modifications. By hovering over the date and time of the model change, customers can see why the merchandise was modified.

ProjectManager's version control listProjectManager's version control list4. Select What to Do With the Chosen Model

As soon as a model has been chosen, there are three choices for a consumer. They’re as follows.

  • Restore: Restores the venture to this model
  • Create a New Mission: The brand new venture will begin from this time limit
  • Export: Export this model of the venture to the consumer’s laptop

It’s that straightforward. Model historical past tracks modifications to duties inside a venture. Most process fields revert to the chosen time limit. This consists of even these duties that had been deleted in that interval. There are, nevertheless, a number of exceptions. These things should not altered: recordsdata connected to duties, feedback on duties, timesheet entries and high-level venture settings, such because the venture identify, description or consumer.

The model management characteristic in ProjectManager is completely different from a venture historical past, process historical past or audit log, which focuses on discovering when sure modifications have been made and who made them. That’s a terrific search device, however model management restores the venture to a particular time limit. It’s a unique characteristic.

Model management can be completely different from the undo or redo button on the Gantt chart, which may return and revert a change that was simply made. Nevertheless it solely goes again one step at a time and if the consumer leaves the Gantt chart, the undo historical past is misplaced. Undo is

Advantages of Model Management in Mission Administration Software program

There are numerous advantages to having model management in venture administration. It’s a strong characteristic that provides venture managers management over their initiatives, particularly when errors are made that may take the venture off monitor. Listed here are some extra of the advantages of model management for venture administration.

  • Helps avoid the risk of dropping work or overwriting necessary info
  • Reverts to the prior model if the consumer requests a revision after which modifications their thoughts
  • Can be utilized to make sure stakeholders and groups are knowledgeable on the newest model of the project plan
  • Helps venture managers and determination makers monitor any modifications made to the venture schedule or finances and revert to a earlier model if wanted
  • Facilitates the method of reviewing, evaluating and approving venture change order requests
  • Evaluating venture variations helps assess the influence of dangers and modifications within the schedule, finances and progress

ProjectManager Provides Sturdy Mission Administration Instruments

Model management is barely one of many many options that ProjectManager has to supply for venture managers and their groups. Our award-winning venture and portfolio administration software program is versatile sufficient to work in a conventional waterfall methodology or agile setting, whether or not managing one venture, a program or a portfolio of initiatives. There are a number of venture views, from Gantt charts, roadmaps and kanban boards to process lists, sheet and calendar views. Useful resource administration retains groups productive and initiatives are tracked in actual time, however there are automated workflows with process approvals and threat administration options to determine and mitigate points.

Plan, Schedule and Observe Tasks With On-line Gantt Charts

Gantt charts are important venture administration instruments and most venture administration software program has one. Identical to the competitors, ours can manage duties, schedule resources and prices and monitor that work in actual time. The place we depart the competitors behind is in having the ability to hyperlink all 4 forms of process dependencies to keep away from pricey delays, filter for the crucial path to determine important duties and set a baseline to trace the deliberate effort in opposition to the precise effort in actual time to assist initiatives carry on schedule and keep inside their budgets.

ProjectManager's Gantt chart with critical path filterProjectManager's Gantt chart with critical path filter
Allocate Assets and Monitor Utilization With Actual-Time Knowledge

Having real-time information does greater than track the project schedule, it may assist management assets. When onboarding a staff, venture managers can set their availability, together with PTO, holidays and international holidays for distributed groups. This streamlines assigning duties. Mission managers can get an summary of their useful resource utilization by visiting the staff web page of the color-coded workload chart, which reveals all the staff allocation for one venture or a number of initiatives. From right here, venture managers can see who’s overallocated or underutilized and stability the staff’s workload to maintain everybody working at capability, which will increase productiveness.

ProjectManager's workload chart with reassign task popupProjectManager's workload chart with reassign task popup
Monitor Mission Progress, Efficiency and Prices and Make Studies in Minutes

With the venture baseline set, all of the software program options acquire stay information and provides managers a number of methods to trace progress, efficiency and prices. The Gantt chart reveals progress by how shaded the taskbar is. For a high-level overview of the venture, toggle over to the real-time venture or portfolio dashboard and easy-to-read graphs and charts show key efficiency indicators (KPIs) reminiscent of time, value and workload. For extra particulars, use customizable reviews that may be generated with a keystroke. Get reviews on standing, portfolio standing, timesheets, variance, workload and extra.

ProjectManager's dashboardProjectManager's dashboard

ProjectManager is on-line venture and portfolio administration software program that connects groups whether or not they’re within the workplace, out within the area or anyplace on this planet. They’ll share recordsdata, remark on the process degree and keep updated with e-mail and in-app notifications. Be a part of groups at Avis, Nestle and Siemens who’re utilizing our software program to ship profitable initiatives. Get started with ProjectManager today for free.



Source link

Tags: ControlManagementprojectSoftwareVersion
Previous Post

Borrowing from your HELOC to invest in equities

Next Post

Private equity suitors line up for Bausch + Lomb eyecare auction

Next Post
Private equity suitors line up for Bausch + Lomb eyecare auction

Private equity suitors line up for Bausch + Lomb eyecare auction

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

POPULAR POSTS

  • 10 Ways To Get a Free DoorDash Gift Card

    10 Ways To Get a Free DoorDash Gift Card

    0 shares
    Share 0 Tweet 0
  • They Combed the Co-ops of Upper Manhattan With $700,000 to Spend

    0 shares
    Share 0 Tweet 0
  • Saal.AI and Cisco Systems Inc Ink MoU to Explore AI and Big Data Innovations at GITEX Global 2024

    0 shares
    Share 0 Tweet 0
  • Exxon foe Engine No. 1 to build fossil fuel plants with Chevron

    0 shares
    Share 0 Tweet 0
  • They Wanted a House in Chicago for Their Growing Family. Would $650,000 Be Enough?

    0 shares
    Share 0 Tweet 0
Solega Blog

Categories

  • Artificial Intelligence
  • Cryptocurrency
  • E-commerce
  • Finance
  • Investment
  • Project Management
  • Real Estate
  • Start Ups
  • Travel

Connect With Us

Recent Posts

Bitcoin is Changing: Saylor Targets $21M by 2046

Bitcoin is Changing: Saylor Targets $21M by 2046

June 23, 2025
Russia watches on as ally Iran is pummeled

Russia watches on as ally Iran is pummeled

June 23, 2025

© 2024 Solega, LLC. All Rights Reserved | Solega.co

No Result
View All Result
  • Home
  • E-commerce
  • Start Ups
  • Project Management
  • Artificial Intelligence
  • Investment
  • More
    • Cryptocurrency
    • Finance
    • Real Estate
    • Travel

© 2024 Solega, LLC. All Rights Reserved | Solega.co